Water Tank Waterproofing Is a System — Not Just a Coating

An RCC water tank holds water under continuous hydrostatic pressure. Concrete contains pores and capillaries, while shrinkage, thermal movement, construction joints and pipe penetrations create possible leakage paths. The right solution must address the structure and its details before the lining is applied.

Weatherblazer’s approach combines surface preparation, construction-joint treatment, compatible coating application and a final water test. It is intended for both overhead and underground RCC tanks, with the system selected after inspecting the tank’s condition and use.

One Tank. One Engineered Method. One Accountable Partner.

A coating alone cannot compensate for untreated joints, weak concrete, contamination or poor application. The method and verification are as important as the material.

Why RCC Water Tanks Develop Leakage

The leak may appear at one point while water travels through the structure from somewhere else. Inspection must identify the pathway, not just the visible damp patch.

01

Construction Joints

Wall-to-floor junctions and cold joints can become leakage paths if not properly detailed and repaired.

02

Cracks & Movement

Shrinkage, thermal cycling, changing water loads and differential settlement can open existing weaknesses.

03

Honeycombing

Voids from inadequate concrete compaction can create local routes for water migration.

04

Pipe Penetrations

Inlet, outlet, overflow and scour pipes need careful detailing at the concrete interface.

05

Debonded Coatings

Contaminated or poorly prepared concrete can prevent a lining from bonding as intended.

06

Tiles & Grout

Tiles are a finish, not a standalone waterproofing system; grout lines and hollow or debonded tiles complicate leak tracing and repair.

The Weatherblazer Water Tank Waterproofing System

The primary waterproofing system is selected according to the water stored. WATERBLAZER EPFG-R is the specified food-grade lining for potable-water tanks, while WATERBLAZER 102 is used for suitable non-potable water-retaining structures. Final selection depends on tank condition, substrate, service conditions and the approved project specification.

01 · Prepare the Structure

Surface Preparation & Defect Repair

Remove dust, oil, grease, release agents, curing compounds and other bond-breaking contamination. Repair unsound concrete and address cracks, honeycombing and weak areas before lining.

  • Mechanically prepare the substrate as required
  • Ensure the surface is clean, sound and dry
  • Do not coat over unresolved structural defects
Substrate readiness first

Construction-Joint Treatment

Give wall-to-floor joints, cold joints and pipe penetrations specific attention. The exact joint detail and repair material must be confirmed for the site before the coating stage.

  • Identify likely water paths
  • Repair and smooth prepared joint areas
  • Allow repairs to reach the required condition
Detail before coating
02 · Select the Primary Waterproofing System

WATERBLAZER 102 Ultra

A flexible polymer-modified mineral slurry that may be specified for suitable underground water-retaining structures, sumps or STPs where movement and water pressure are key considerations. It is an alternative system for the appropriate application, not an automatic substitute for a potable-water lining.

  • For suitable non-potable water tanks and water-retaining structures
  • Applied to a properly prepared and repaired substrate
  • Use the current TDS and approved method statement for coat count, coverage and curing
Primary system for non-potable water

WATERBLAZER EP-PRIME

The EPFG-R TDS specifies priming prepared concrete with WATERBLAZER EP-PRIME before applying the epoxy lining. Porous substrates may require two primer coats as directed by the TDS and project method statement.

  • Primer for the EPFG-R system
  • Apply only after suitable surface preparation
  • Allow the primer to dry as specified
Primer specified in EPFG-R TDS
Important: Potable-water suitability must be supported by the applicable product documentation. WATERBLAZER 102 is positioned here for non-potable tanks; do not specify it for drinking-water contact unless the current product documentation explicitly confirms suitability. Follow the current TDS and approved project method statement.

Additional Materials for Repairs & Detailing

Beyond the primary lining and primer, tank waterproofing may require compatible repair mortars, crack fillers and joint-detailing products. These are selected according to the defect, joint movement, tank use and approved method statement.

Waterblazer SBR / Creteblazer ACRL

Polymer modifiers used in compatible repair mortar for patching honeycombed, damaged or locally defective concrete before the waterproofing system is applied.

Concrete repair support

Crackblazer Paste

Ready-to-use crack-filling paste for suitable non-moving cracks and local defects. The crack must be assessed first; active or structural cracks need an appropriate engineered detail.

Crack and defect treatment

Jointblazer AL / Fleece Tape

Joint-detailing tape used at suitable construction joints, wall-to-base junctions and pipe penetrations as part of the approved detailing system.

Joint and penetration detailing

Waterblazer 102

A two-component polymer-modified mineral waterproofing slurry for suitable non-potable water-retaining structures. It forms a flexible, crack-bridging coating and is selected for the tank and exposure conditions after site assessment.

Condition-specific flexible system
Material selection: These supporting materials are not required on every tank. Confirm compatibility, potable-water contact suitability where relevant, substrate condition and application details against current product documentation and the approved project method statement.

Match the Method to the Tank

Overhead and underground tanks share many failure modes, but access, external moisture, structural condition and service requirements can differ. A site inspection determines the right scope.

New RCC Tank

Plan the waterproofing window, joint details, substrate acceptance and lining before handover. Avoid treating the coating as a substitute for sound concrete and proper joint design.

Specification before coating

Existing Leaking Tank

Empty and inspect the tank, trace the leakage paths, repair defects, prepare the surface and apply the approved system only after the substrate meets installation requirements.

Diagnosis before repair

Overhead Tank

Plan access and safe work at height, protect the water supply during shutdown and account for exposure and repeated wetting/drying cycles.

Access & service planning

Underground Tank

Assess visible leakage, external moisture conditions, pipe penetrations and any evidence of movement or settlement before recommending rehabilitation.

Condition-led system selection

Potable Water Storage

Use a lining documented as suitable for potable-water contact and plan the curing, cleaning and recommissioning requirements before returning the tank to service.

Documented suitability

Industrial / Process Tank

Confirm the stored liquid, temperature and chemical exposure before selecting a lining. Potable-water suitability alone does not establish compatibility with every chemical.

Use-specific compatibility

The 9-Step Water Tank Waterproofing Process

The published Water Tank Waterproofing guide emphasises preparation, joint engineering, lining and verification. The precise repair details and material application must be confirmed for each tank and follow the current approved TDS/method statement.

01
Tank Inspection
Record tank type, use, condition, visible leakage, access, existing finish and service constraints.
02
Empty & Make Safe
Coordinate shutdown, drain the tank, arrange safe access and apply suitable confined-space and work-at-height controls.
03
Surface Preparation
Remove contaminants and unsound material. The EPFG-R TDS requires a clean, sound and dry substrate free from bond-breaking contamination.
04
Treat Joints & Defects
Identify and repair construction joints, cracks, honeycombing and pipe interfaces before lining. Structural concerns require appropriate technical review.
05
Final Surface Check
Smooth repaired areas and confirm that the substrate is suitable for primer and coating application.
06
Apply EP-PRIME
Prime as specified in the WATERBLAZER EPFG-R TDS and allow the primer to dry for the prescribed interval before coating.
07
Apply EPFG-R Coats
Mix the two components as instructed in the TDS, respect pot life and recoat intervals, and achieve the specified two-coat system.
08
Cure & Inspect
Protect the lining during curing and inspect for visible defects before the tank is recommissioned.
09
Water Test & Handover
After the required full cure, conduct the agreed water test, rectify any identified defects and retest before handover. Record the outcome.

Why a Seamless Lining Is Different from Tiles

Tiles can provide a finish, but grout lines and debonded areas can make water paths difficult to trace. A properly applied seamless lining avoids grout joints across the coated area; it does not remove the need to engineer construction joints and pipe penetrations.

Tile-Based Finish

Grout joints, hollow tiles and debonded adhesive can complicate leak tracing. Repairs may require tile removal to reach the underlying defect.

Seamless EPFG-R Lining

The specified epoxy system forms a dense, impervious coating with a smooth, cleanable surface. Its performance still depends on substrate preparation, detailing, application and curing.

Stop the Leak Before You Recoat the Tank Again.

Tell us whether your tank is overhead or underground, whether it stores drinking water, and what leakage or coating problem you are seeing. We will inspect the condition and recommend an appropriate system.

Request a Water Tank Site Inspection

Quick Enquiry

Fill in your details and we'll get back to you shortly.

Quick Enquiry

Fill in your details and we'll get back to you shortly.

Thanks for Your Enquiry!

Our Expert will connect you shortly.A confirmation email with our Company Profile and Product Catalog has been sent to your email.

Chat with us on WhatsApp